Great preparation for the coming season and our Topper Travellers


We had our “moment of truth” with the 6 boat trailer recently. The kit was assembled and much to everyone’s relief it all fitted together. Many thanks on behalf of the Training Team for all of the excellent work that has been done by John Spruce, Lionel, Hugh, and all other Tuesday Group members involved. They have done a brilliant engineering job repairing and adapting the boat rack so that it can be attached to the new chassis, and then assembling the new trailer. There are a few small jobs still to do, but we aim to have it roadworthy by 15th. for Topper Academy at Largs.

trailer1

 

trailer2

 

Everything bar the boat rack its ‘self is now new and of the correct size/rating. The much repaired old subframe (below) can now proceed for recycling!…..

trailer3

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s